VANCOUVER, BC December 6, 2007 Abacus Mining & Exploration Corp. (TSX.V:AME) (the "Company") is pleased to announce diamond drill results from the first 15 holes of a 32 hole, 29,875 foot (9,106 metre) program on its DM/Audra/Crescent ("DM") deposit, which lies 1.5 kilometres east of the old Afton mine and infrastructure. The focus of the drilling at the DM Zone is to upgrade and constrain the 43-101 compliant resource completed in 2005. Since the DM resource was calculated, the Company has completed an additional 51 drill holes totaling 53,359 feet (16,264 metres) on the deposit during 2006 and 2007. The Company plans to update the 43-101 compliant resource estimation on the DM zone by second quarter of 2008.
"The DM zone's resource is only 1.5 kilometres from the existing infrastructure and has a low strip ratio, which enables Abacus to look at the DM deposit as an important component of a potential multiple pit mining plan at Afton. This complements and adds to the proposed 2010 production from Ajax and elsewhere." said Doug Fulcher President and CEO. "Additionally Abacus continues to expand the resources at the Afton Ajax camp with the large multi pit scenario as the focus moving forward."
DM Zone Highlights
The following tables list the most recent drill results from the DM zone. Intercept lengths are core lengths, which do not necessarily reflect true width. Section spacing is 30 metres. A drill hole plan map is available at www.amemining.com.
DM-AUDRA-CRESCENT DRILL RESULTS BY SECTION
Section |
Hole No. |
Dip Deg |
Az. Deg |
Hole Length (m) |
From (m) |
To (m) |
Length (m) |
Copper % |
Gold g/t |
---|---|---|---|---|---|---|---|---|---|
19N |
DA-07-072 |
-45 |
312 |
199.64 |
NSV |
||||
|
|
|
|
|
|
|
|
|
|
22N |
DA-07-069 |
-45 |
312 |
160.63 |
29.57 |
63 |
33.43 |
0.56 |
0.33 |
|
|
|
|
|
|
|
|
|
|
23N |
DA-07-068 |
-44.9 |
308.8 |
173.43 |
39 |
72 |
33 |
0.38 |
0.34 |
|
|
|
|
|
|
|
|
|
|
24N |
DA-07-067 |
-45 |
312 |
189.59 |
38.71 |
84 |
45.29 |
0.16 |
0.14 |
|
|
|
|
|
|
|
|
|
|
25N |
DA-07-066 |
-44 |
310.8 |
175.87 |
39 |
84 |
45 |
0.18 |
0.08 |
|
|
|
|
|
|
|
|
|
|
26N |
DA-07-065 |
-45 |
312 |
157.58 |
65 |
89 |
24 |
0.23 |
0.09 |
|
|
|
|
|
|
|
|
|
|
27N |
DA-07-064 |
-44.5 |
312.3 |
172.82 |
15 |
39 |
24 |
0.19 |
0.05 |
|
|
|
|
|
|
|
|
|
|
29N |
DA-07-063 |
-45 |
312 |
164.59 |
60 |
90 |
30 |
0.33 |
0.05 |
|
|
|
|
|
|
|
|
|
|
31N |
DA-07-061 |
-44.8 |
315.3 |
63.09 |
9.14 |
24 |
14.86 |
0.16 |
0.24 |
|
|
|
|
|
|
|
|
|
|
31N |
DA-0-062 |
-44.5 |
312 |
199.03 |
78 |
105 |
27 |
0.18 |
0.02 |
|
(redrill of 061) |
|
|
Incl |
96 |
105 |
9 |
0.23 |
0.01 |
|
|
|
|
|
|
|
|
|
|
33N |
DA-07-060 |
-44.5 |
313.5 |
221.59 |
74 |
80 |
6 |
0.31 |
0.05 |
|
|
|
|
|
|
|
|
|
|
36N |
DA07-059 |
-45 |
222 |
175.87 |
48 |
63 |
15 |
0.36 |
0.20 |
|
|
|
|
|
|
|
|
|
|
36N |
DA-07-058 |
-75.1 |
306.5 |
306.93 |
153 |
159 |
6 |
0.26 |
0.11 |
|
|
|
|
|
|
|
|
|
|
36N |
DA-07-057 |
-46 |
310 |
379.48 |
NSV |
||||
|
|
|
|
|
|
|
|
|
|
36N |
DA-07-056 |
-44.2 |
131.5 |
306.32 |
36 |
72 |
36 |
0.23 |
0.05 |
|
And |
|
|
|
108 |
216 |
108 |
0.29 |
0.18 |
|
Incl |
|
|
|
108 |
177 |
69 |
0.33 |
0.22 |
|
Incl |
|
|
|
132 |
156 |
24 |
0.42 |
0.23 |
|
|
|
|
|
|
|
|
|
|
About the Afton Property
The Afton properties belonging to the Company lie within a mining camp hosting a number of mined and un-mined alkalic copper-gold, porphyry style deposits. Since 2002, Abacus has redefined several known deposits through expansion of down-dip and strike extensions. In doing so, the Company has completed 399,000 feet (121,618 metres) of drilling. To date, the Company has developed NI 43-101 compliant indicated resources on the DM and Rainbow deposits, totaling 60.1 million tones and an inferred resource at the Ajax West deposit totaling 147,000,000 tonnes (all resources calculated at 0.20% copper cutoff).
During this time frame, the existing DM/Audra/Crescent compliant resource, completed in 2005, will also be recalculated, incorporating the recent 2006 and 2007 drilling.
Upon completion of all resource estimates, Abacus intends to progress their Afton project through preliminary economic studies and into feasibility during the second half of 2008.
Eco Tech Laboratory Ltd. of Kamloops, B.C., has completed all of Abacus's analytical work on the project. A quality-control program, using specific standards and blank samples is in place. Robert G. Friesen, P.Geo. is the qualified person responsible for the design and conduct of the work performed.
On Behalf of the Board,
ABACUS MINING AND EXPLORATION CORPORATION
Doug Fulcher,
President and Chief Executive Officer
Forward-Looking Information
This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Abacus Mining and Exploration Corp. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Forward-looking statements in this release include statements regarding the Company's rights and benefits under the letters of intent with New Gold and Teck Cominco; the Company's future exploration and development plans; and the timing and nature of any future resource estimates, economic analyses or feasibility studies. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change. These statements are based on a number of assumptions, including, among others, assumptions regarding general business and economic conditions, the ability of the Company and other relevant parties to satisfy stock exchange and other regulatory requirements in timely manner, the availability of financing for the Company's proposed transactions and exploration and development programs on reasonable terms and the ability of third-party service providers to deliver services in a timely manner.
You can view the Next News Releases item: March 3, 2008,Abacus Continues Expansion Of Primary Afton Target At Ajax
You can view the Previous News Releases item: November 29, 2007,Mr. Thomas A. Mckeever Appointed Chairman Of The Board
You can return to the main News Releases page, or press the Back button on your browser.